Out of 400 virtual machines, 10 have been discontinued and 15 have been shut down for the foreseeable future.
Healthcare | France
Installed solution
DC Scope®
Context
70 facilities, 6,000 employees and over 900 self-employed healthcare professionals
100% VMware virtualization infrastructure
400 VMs and 20 ESX, several clusters
Implemented solution
DC Scope® installation
Capacity planning: view the values and status of each allocated and consumed resource according to selected dates. Saturation alerts and multiple scenario analysis.
High utilization of troubleshooting: rapid identification of VM degradation and RAM, CPU and Disk counters. DC Scope® even reports the source of problems and the time at which they occurred.
Results
Significant time savings when modeling the IT project budget: Before: 10 days to analyze and process data Today: 2 days + professional graphics to illustrate
Out of 400 VMs: 10 deleted, 15 shut down pending deletion
Faster, more accurate qualification of DRP needs on second site, improved infrastructure TCO
More efficient capacity planning simulations for IT projects
Why EasyVirt ?
Reliable information on VMs added, deleted or deactivated
Actual utilization rates on different clusters